Kelowna, BC—Enertopia Corporation (ENRT) on the OTCQB and (TOP) on the CSE (the “Company” or “Enertopia”) is pleased to announce the first drill hole (TOP-04) was completed to a depth of 297 feet with the bottom of the hole still in the lower green claystone. The upper claystone was intersected at 42 feet and the reduced zone was intersected at 82 feet and the lower claystone intersected at 212 feet. Drill hole TOP 04 confirms the mineralized lithium claystone assemblage remains intact on the northern part of the company’s property, as was intersected in hole DCH-09 by Cypress Development west of our claim boundary.